Budd’s Farm Gasholder
Our Biogas division recently installed this 2,100 cubic metre slab-mounted gasholder at Budd’s Farm in Havant for Southern Water and Barhale Trant Utilities. This was to replace an existing gasholder that had come to the end of its long and successful working life – a project that our Director of Engineering Richard Cherry was originally involved in.
Like most of our installations, this gasholder is bespoke to suit the client’s specific requirements, but the general design follows our own unique double-membrane construction technique. This is a tried and tested method to ensure high levels of off-site quality control and efficient on-site installation. Working pressure of this gasholder is 25 millibar.
We are pleased to report that our client and the end user are both very pleased with the final product and the whole project process.