Another BioSphere collaboration for a European client

Date posted: 21 November 2018
Posted in: Uncategorized

Here is another medium-sized BioShere collaboration between our Biogas and Manufacturing divisions for a European client, undergoing inflation testing at our in-house production facility.

Rotherdale Lagoon Cover

Date posted: 20 November 2018
Posted in: Uncategorized

Our Biogas and Manufacturing divisions are currently collaborating on a project for Vale Green Energy, a lagoon cover at Rotherdale Farm in Pershore, Worcestershire. The dimensions of the cover are 59.8m long by 35.8m wide, and capacity is 9,555 cubic metres. The membrane manufacturing process is currently ongoing with delivery and installation scheduled for the end of this month.

 

 

 

Knostrop Sludge Treatment Facility slab-mounted BioSphere

Date posted: 26 July 2018
Posted in: Uncategorized

Mounted on a 3m concrete plinth, this 4,000 cubic metre BioSphere gasholder was recently installed by our installation crew at Knostrop Sludge Treatment Facility in Leeds for Yorkshire Water Services Ltd. With a base diameter of nealy 18m and a height of around 15.5m, this BioSphere is an imposing structure that requires expert installation techniques and takes around six hours to inflate once secured to the plinth. All production was performed in-house by AJ Tensile Manufacturing Ltd at our facility in Caldicot, with design, project management and installation performed by AJ Tensile Biogas Systems Ltd. Additional volumetric checks were performed on-site after inflation to confirm the accuracy of the level-checking laser by measuring discharged air using an anemometer.

The X Stage at All Points East Festival, London

Date posted: 24 July 2018
Posted in: Manufacturing, Uncategorized

The Special Projects division of A J Tensile Manufacturing Ltd recently completed a prestigious staging installation for one of our major clients. Consisting of two 60m arched trusses with an octagonal suspended roof over a raised stage, the structure was one of seven temporary staging installations for the All Points East Festival in Victoria Park, East London. Our fabric panels provided cover and backdrop for the lighting arrays built into the arches.

 

We had to work to a very tight schedule but our client was very pleased with the final result, saying “A J Tensile did it again, managing to deliver as always, despite the late information”.

A small Biosphere gasholder for Ontario, Canada

Date posted: 3 July 2018
Posted in: Uncategorized

Our Biogas division recently completed one of the smallest gasholders we have ever produced for a client in Ontario, Canada. Measuring just 50 cubic metres and standing around 4m tall, the double-skinned slab-mount Biosphere was awarded to us by our North American licensee and manufactured in-house by our Manufacturing division before being carefully packed and crated for export. 

Test inflation at our production facility.

Our Biogas division is recruiting site installation subcontractors

Date posted: 10 May 2018
Posted in: Biogas Systems, Manufacturing, Tensile Fabrications, Tension Structures, Uncategorized

AJ Tensile is seeking practical self employed sub-contractors to assist us with the installation of various projects (predominantly biogas membranes) throughout the UK.

CSCS accreditation is a must, along with a hands-on and flexible approach.

Please email gary@ajtensile.co.uk expressing your interest.

St Croix, US Virgin islands - USA

BioSphere gas dome ready for packing

Date posted: 19 April 2018
Posted in: Biogas Systems, Manufacturing, Uncategorized

This 3890 cubic metre slab-mount BioSphere gasholder is getting final checks at our production facility before being packaged up ready for installation at Knostrop Sludge Treatment Facility in Leeds. Our team will be installing it over a period of two weeks for our client Black and Veatch.

AJT Biogas projects in Water & Wastewater Treatment magazine

Date posted: 8 March 2018
Posted in: Uncategorized

Of the ten treatment sites listed in this article, 60% of them are A J Tensile Biogas Systems Projects: Great Billing, Cardiff Bay, Budds Farm, Davyhulme, Avonmouth and Knostrop.

(Right-click the image and ‘open image in new tab’ to read the article)

Source: Water & Wastewater Treatment for the Wholesale Market magazine, March 2018 (Volume 61, Issue 3)

 

 

 

 

Sandown inflation test

Date posted: 6 March 2018
Posted in: Biogas Systems, Manufacturing, Tensile Fabrications, Uncategorized

Inflation test at our production facility of the inner liner for a 975 cubic metre gasholder at Sandown, Isle of Wight.

Winter is coming again, so up goes the tennis dome.

Date posted: 30 November 2017
Posted in: Uncategorized

It seems like only yesterday when spring had sprung and we were called in to deflate the Coolhurst dome ready for summer. Time flies like an arrow though and winter is almost upon us, so it’s that time of year again to give comfort and protection to the hardy cold-weather players. This time the dome is covering two of the club’s new clay courts rather than the hard surfaces of previous years.